More towpath repairs.
These are where we're moored. In 4 hours the only work done was by one man operating a pounding machine to flatten the sand and stones. This took about 30 minutes. There were 6 men there plus 2 cars and 2 vans. They left about 3 pm and a little later someone came and trickled a bit of tar around some of the edges.