The driver thought a closer inspection was possible.
Again I asked the driver to bring me to the main entrance of the construction-site of the new swimming stadium for the 2008 Olympics in Beijing. Here again, the temporary buildings to the left of the fence house the migrant construction workings in charge of this site.