We're a little bigger than the neighbours. We are officially at 'lock-up' stage, (although the back door was open today).
We're probably 3 months away from moving in, as long as everything goes to plan. The plaster boards are all on and most of the external painting is done, just a bit left to do on the cladding above the garage. They'll probably plaster out the inside next week, then it's just fit-out, painting and flooring.
I couldn't get upstairs as they've plastered over my access route, (I used to shin up the inside of the laundry chute Spiderman stylee).
I met up with a landscaper at site today for some ideas and quotes on what to do with the drive and gardens.
It's all getting a bit exciting!