1: Frame finished. 377 secs
We went to check progress on the house today, and what progress there has been!

The frame is finished, plumbing first fix is done, windows and doors are in and bricks have been delivered ready to start being laid next week.

There was no ladder or stairs, so I did my best Spiderman impression and shinned up the inside of the frame to get some pics of upstairs.

Tony & Emma.


Additional photos below
Photos: 35, Displayed: 22


Advertisement

11
1

Front
22
2

Front.
33
3

Front
44
4

Front
55
5

Front - main bedroom balcony
66
6

Front
77
7

Side
88
8

Back - orchard side
99
9

Back
1010
10

Back
1111
11

Back-side looking at rear of garage which will have a through&through garage door (to get the boat through).
1212
12

Back-side
1313
13

Back garden
1414
14

Orchard side garden
1515
15

Bricks - dark for the front, light for the rest.
1616
16

View down our street at road level.
1717
17

The horse fields opposite our house
1818
18

Temporary front door.
1919
19

Formal lounge.
2020
20

Formal lounge viewed from study.
2121
21

Study & theatre beyond viewed from lounge.


Tot: 0.105s; Tpl: 0.011s; cc: 10; qc: 51; dbt: 0.0684s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1; ; mem: 1.1mb