Advertisement
« previous next »
Moving the Measurement Ribbon  
   

Moving the Measurement Ribbon

Though the depth is recorded on the machine, as a backup a ribbon is placed on the cable so the driller can tell at a glance when they have reached the undrilled part of the hole and should begin drilling.
Ice Core Drilling

January 10th 2006
These are the photos I took of the ice core drilling team. They were from the University of Wisconsin- Madison. I found this process to be very interesting. I hope you enjoy them. ... read more
Advertisement
Tot: 0.042s; Tpl: 0.003s; cc: 5; qc: 33; dbt: 0.0272s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1; ; mem: 1.1mb