Work at Habitat Site


Advertisement
Poland's flag
Europe » Poland » Lesser Poland » Kraków
September 4th 2006
Published: September 5th 2006
Edit Blog Post

While the US celebrated Labor Day today (and most of our Thrivent friends celebrated the holiday with a day off), we labored intently throughout the day working on mulitiple projects throughout Tomasz' home. Teams were assembled to complete insulation, begin dry-walling, taping and mudding the walls, continue to dig trenches, etc. An abrupt rainstorm halted the trenching team for a brief period, but the skies later cleared and work resumed. Everyone felt enormously satisifed with the amount of work accomplished during the course of the day.

Returning to Krakow in late afternoon, we gathered as a group for reflections before departing to the Market Square for dinner. We ended up dining in the cavern-like basement of an American-themed restaurant where we sat in a covered wagon and enjoyed fun and frivolity. During dinner we enjoyed sharing the "quotable quotes" that were attributed to the team members. (See separate blog entry.)



Advertisement



Tot: 0.259s; Tpl: 0.022s; cc: 9; qc: 47; dbt: 0.0472s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1; ; mem: 1.1mb