Work


Advertisement
Ghana's flag
Africa » Ghana
September 27th 2008
Published: September 27th 2008
Edit Blog Post

I forgot to bring my lead to the cafe yet again so still no more photos AHHH! We finely had a good mornings work, levelling off around the outside of the school kitchen. At the moment we've got the school kitchen up to the lintel level. The toilet block is almost ready for roofing but I don't think they've got the materials to do it, so we're not likely to see anything finished. We've also started work on the library, the first level is already there but due to leakages we're building another level.

For the first week or so there was loads of work for us to do, mainly carrying blocks, mixing cement, digging foundations and filling in between blocks as the masons lay them. But as the structures gone up there's gradually been less that we can do. The jobs require the skills of the workers, who have sometimes just come to work for a few hours in the morning and then not come back.

Run out of time but I'll add more soon!

Advertisement



Tot: 0.078s; Tpl: 0.014s; cc: 9; qc: 49; dbt: 0.0336s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1; ; mem: 1.1mb