Work in progress
April 3rd 2004 Here we are in April already. Pete has rewired most of the boat. A 35 gallon waste tank has been installed. The air conditioner is now working. We have transfered the equipment from Zoo, and it is up for sale. New main sail cover, all new canvas, propane tank installed in the stern. Pete is working on aft cabin making an anchor well. Pete will take drawers from front locker, install shelves instea
... read more