Advertisement
Published: September 22nd 2007
Edit Blog Post
We have a few days off work. Pete and I have been all over the boat. Making decisions as to what it needs. We did move Zoo over to a neighbors dock. We are going to take some equipment of Zoo, install it in Paper Moon.
As we see it now, Paper Moon needs electrical work, major work. The JRC radar/chartplotter in Zoo, will be transfer over. The new VHF will too.
The plumbing needs to be redone. There is no holding tank. Missing front toilet.
Where to start.....
Advertisement
Tot: 0.176s; Tpl: 0.008s; cc: 14; qc: 60; dbt: 0.0778s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1;
; mem: 1.1mb