Tuesday 31st July


Advertisement
Published: August 19th 2007
Edit Blog Post

Woke up 0445

Up and out 0520

on site 0530 (on time)

Work today. Same route!!! Moving 4m timber today lengths of 4x3 heavy work again, but getting up early means we dont work in the heat of the day.

Achievements: All timber shifted. Finished our out door shower which consisted of a wooden frame which supported a bucket with holes in. It worked wonderfully.

Highlights. Swimming in the river and cooling off. Amanda , hugh and Yvette arriving from field base.

Advertisement



Tot: 0.085s; Tpl: 0.01s; cc: 9; qc: 51; dbt: 0.0517s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1; ; mem: 1.1mb