Advertisement
Published: June 13th 2008
Edit Blog Post
I quit my job on Sept 28th so that I could get a bunch of projects done around the house in order to rent it while we're traveling for a year. I thought it would take about 3 months. Well I had the dumbest idea ever and suffered for it.
We have a seasonal creek that runs across our property and it often caused us a bunch of headaches when we got a lot of rain. A pipe that ran through needed to be replaced and I wanted to improve the appearance of the ugly concrete and cinder block overflow channel. So I thought it would be cool to pour concrete in a rippling design and then essentially tile it with pebbles. Um, duh, imagine how long it takes to tile about 300 square feet with pebbles. Yeah, like 7 months. Ugh!
Check out the pictures of my crazy project. That's supposed to be a sea serpent on the right. The other side is interspersed with bits and bobs of interesting things that have been laying around the house.
The good news is that we are finally leaving for Fiji on Monday. Will blog from there and beyond.
Everyone have a great weekend!
Advertisement
Tot: 0.113s; Tpl: 0.009s; cc: 9; qc: 67; dbt: 0.0532s; 1; m:domysql w:travelblog (10.17.0.13); sld: 1;
; mem: 1.1mb
Sandy
non-member comment
Awesome!
Wow, hard work but it paid off woman! It looks marvelous darling... be proud of your idea, art should never be labeled by the time but the love, energy and YOUR creativeness put into it .. its looks great and probably very functional too .. kudos should go to you .... glad I'm on your blog I wish you both well enjoy your trip and are you sure you can't take me with you???? Let me feel like i am through this site, OK?