The Windows are in!
February 23rd 2009 Greetings!
Good News today, I have just returned from 5 days off in Luxor, Egypt (more on that later) and there has been a flurry of activity at the school. The windows have now been installed in the classroom and the door has been delivered. The door should be installed over the next week or so.
The next step is to finish the floor and plaster the inside and outside walls. With
... read more