PANAMA CANAL
August 2nd 2013 Up bright and early this morning 5.30a.m. to see our entrance into the Panama Canal, this is one amazing engineering feat, into our first lock at 6.30a.m, the Gatun Locks. It was an all day job with us descending into the Pacific Ocean at around 4.30p.m. We went through three sets of locks of a total of 27m up into Gatun Lake ,first then onto Gamboa and passing under the Sentenial bridge, then Ped
... read more