15 Monitoring Blog for Site 96 October 2012 EWB Erosion Control
March 5th 2013 Tech Monitoring Blog for October 2012 Erosion Control Minga Project Area = Will Mahoney's Site 96
Site 96 is a drainage immediately north of Malinguapamba with an eroding scarp uphill from the road and gully (riochuelo) downstream. EWB-guided Minga last October installed rock revetment, check dams, drop structures, cutback slopes, laid in erosion control blankets, and planted shrubs.
(Pr
... read more