Ferry, 'cross the Cook Strait
February 3rd 2005 Doesn't have quite the same ring to it as the Gerry and the Pacemakers number but the having sailed across both I can say that this one wins hands down.
It was an early crossing so we had to be at the port for 7am, the boat left at 8am and it was so foggy that we didn't hit top speed for a while, the crossing took about 20 minutes longer than expected and we docked in Picton at 10:35.
The vi
... read more